User Rating: / 0
PoorBest 
Blog Directory

GIA003 GSXR 1260 / MV Augusta / G-Tek: Stage 2

GIA003 is coming together now, the frame-kit for the GSXR 1260 engine and MV Augusta swingarm is taking shape.

Previously the tubes were fitted and tacked into position. Since then the Sub Frame has been made and both the Frame & Sub-Frame were TIG Welded. The welding took a good day....perfect welds are not optional but essential for these projects and no corners can be cut. The CNC Billet Gussets were fitted and tacked into position.

A good few days were spent working with the suspension points for the MV Augusta Swingarm, making sure we were happy with the set-up and positioning. The brackets made to fit were machined and lovingly finished by hand with the file and a good polish.

Not too much more to do now, expecting this one to be out the door this month.

(Click to enlarge)